Specifications |
|
Surfaces | copper, PVC, polypipe, & metal |
Interior/Exterior | interior & exterior |
Drying time | allow 30 minutes for Eli-Wrap to set rock hard |
Catalyst | water |
Resin make-up | polyurethane |
Heat resistance | over 200°C (390°F), service temps as low as -45°C (-50°F) |
Bonds | copper pipe, PVC, polypipe, metal & fibreglass |
Sets | 20-30 minutes, sets underwater |
Chemical, fuel and oil resistance | most diluted chemicals and fuels |
Strength | internal pressure up to 1000 k.p.a. |
Pressure | up to 30 Bar (435 psi) |
Mixing
Wear the gloves provided and knead the required amount of steel putty to a homogeneous state.
Application
Open the pouch and immerse the Eli-Wrap Bandage in fresh water for 10 seconds to activate. The entire contents must be used once the package is opened. Apply kneaded Steel Putty to cover the leak site. Then apply the Eli-Wrap Bandage around the damaged area, extending up to 50mm either side of the leak to ensure complete coverage. It is important that the bandage is applied quickly as curing begins once it is taken out of the water.